← Back to Palm Beach International Airport
Drone Rules for Palm Beach International Airport
West Palm Beach, Florida (FL)
• United States
1000 James L Turnage Blvd, West Palm Beach, FL 33415, USA
Lat: 26.6857 • Lng: -80.0928
Rules Edit History: Palm Beach International Airport
Showing changes between revisions.
Mapped shape change
Old outline is gray. New outline is blue.
May 27, 2026 8:21 PM
Approved
• enhanced flying rules for airport
Moderation feedback
Approved
Confidence: 0.90
Your proposed rule edit has been approved. It accurately reflects the drone operation requirements near Palm Beach International Airport, including the need for airspace authorization, LAANC availability, and coordination with Air Traffic Control.
Sources
- https://adip.faa.gov/agis/public/#/airportData/PBI — Info found at ICOA Id KPBI
- https://airaware.aloft.ai/?lat=26.73432161983503&long=-80.10804949541928 — Info found at ICOA Id KPBI
- https://faa.maps.arcgis.com/apps/webappviewer/index.html?id=9c2e4406710048e19806ebf6a06754ad — Info found at ICOA Id KPBI
Changed fields
Mapped shape change
Click to load this change into the shared map viewer here.
| Field | Before | After |
|---|---|---|
| Summary | This is a towered US Airport, check LAANC availability to fly here. | This is a major towered airport. LAANC is available, and is required to fly here. Flight in 0 foot grids requires a manual waiver. |
| Mapped shapes | 8a85914e-a5cb-4e0b-b239-5357f8265358 | 63dae4b1-7675-49f5-ad2a-d10c6138e8d8 |
Before
## Towered Airport. Check for LAANC availability to get a permit to fly here.
After
#### Major Towered Airport - FAA Controlled Airspace, LAANC or Manual Approval Required To Fly Here --- Class C during active hours (24 hours a day) - LAANC Available and is required, automatic approval on AirControl - 0 foot ceilings require manual waivers through FAADroneZone, which could take up to 30-90 days - Authorization required within a 5 mile radius Check rules before flying and be vigilant to manned aircraft, likely very frequent due to size
Show inline change markers
+ + --- + + Class C during active hours (24 hours a day) + - LAANC Available and is required, automatic approval on AirControl + - 0 foot ceilings require manual waivers through FAADroneZone, which could take up to 30-90 days + - Authorization required within a 5 mile radius + + Check rules before flying and be vigilant to manned aircraft, likely very frequent due to size
May 19, 2026 1:03 PM
Approved
• FAA import OURAIRPORTS_AIRPORTS_US:KPBI|3766
Changed fields
Mapped shape change
Click to load this change into the shared map viewer here.
| Field | Before | After |
|---|---|---|
| Rule category | — | Air |
| Flight status | — | Permission |
| Summary | — | This is a towered US Airport, check LAANC availability to fly here. |
| Mapped shapes | — | 8a85914e-a5cb-4e0b-b239-5357f8265358 |
Before
After
## Towered Airport. Check for LAANC availability to get a permit to fly here.
Show inline change markers
+ ## Towered Airport. Check for LAANC availability to get a permit to fly here.