Balbina Dam
Presidente Figueiredo, Amazonas (AM)
• Brazil
Usina Hidrelétrica de Balbina - Balbina, Pres. Figueiredo - AM, 69735-000, Brazil
Lat: -1.91722 • Lng: -59.4736
Flight status:
No fly
Keep this rule information accurate
Edit the flight status, boundary, source details, and rule summary for this place.
Rules summary:
The airspace over and surrounding the Balbina Hydroelectric Power Plant (UHE Balbina) (Presidente Figueiredo, AM) is classified as a Critical Infrastructure Protection Zone and Environmental Reserve Buffer. Civilian drone flights are strictly prohibited directly over the dam structure, powerhouse, substations.
Location
Added May 28, 2026
Map is not loaded yet
Load it only when you need to view the location.
Photos (0)
Photos are hidden because this spot is No fly.
See rules.
Reviews
Reviews are hidden because this spot is No fly.
See rules.